With the TKS project, Daikin managed to provide a total solution including heating, cooling and ventilation to the new 2.200 m2 corporate headquarters of TKS in Borken, Germany  

 About the project

 

Building type  Office building 
Products installed  2x 40 kW air-to-water heat pumps  

 

2x Split Units and a Daikin Perfera indoor unit

1x Daikin ventilation unit with ERQ connection 

2x VAM 

1x iTM with WAGO interface 

 

TKS GmbH is the market leader for complex refurbishments in the European brand hotel industry. The company is also well known for paying close attention to sustainability when designing solutions for clients. So, it is no surprise that they required the same attention to sustainability in the design of the HVAC system for their building. 

 

Heating, cooling and ventilation in a single total solution

 

Daikin convinced TKS with a total solution approach, perfectly integrating technologies for commercial applications and technologies from the residential portfolio.

Two air-to-water heat pumps, one per wing of the building, were installed on the ceiling to ensure there was a perfect working environment at TKS offices. While a Daikini D-AHU Modular P system with an airflow of up to 3,650m3, in combination with two VAM series ventilation systems with heat recovery that provide air flow up to 650 m3, were installed to provide the building with ventilation, and then with the correct air exchange and air filtration needed to create a healthy and comfortable work environment. 

Read morehereabout howindoor air quality can help create a better working environment.

The necessary cooling for the server room, then, is provided by two Daikin split units providing air conditioning through an indoor unit from the Perfera series. 

The whole system is controlled by Daikin's Intelligent Touch Manager (iTM) with WAGO interface. The user-friendly control system ensures further energy savings thanks to intelligent energy management, also ensuring trouble-free maintenance. The WAGO interface also allows Daikin to control third-party technology such as lighting, pumps and fans with the iTM 

Energy efficiency is among the main goals

All decisions made in terms of building design as well as Air Conditioning system design, were based on the Energy Saving Ordinance (EnEV from 2016) requirements. So, efficiency was among the most important goals in this HVAC project, both to provide the building with technology that can generate savings on operative costs, but also to minimize the impact the TKS headquarters will have on the environment.  

 