Daikin complete solution for a business center

With this project, Daikin managed to provide a total solution, including chillers, heat pumps, Air Handling Units, VRVs Units and split systems, to meet the needs of a business center housing the offices of an important bank in Budapest - Hungary.

Products Installed

- 2x Drycooler

- 2x EWWQ-G heat pump version (special stack installation with compressor enclosure)

- VRVs

- Split Systems

- 4x EWYQ-F heat pump with partial heat recovery on two of them

- 11x Air Handling Units from the Modular R/P Series

- Daikin on Site

About the project

The pieces of equipment described above will be used to ensure the right level of comfort to the employees of a big bank, which will take advantage of an impressive business center facility. The HVAC (Heating Ventilation and Air Conditionig) system will meet the cooling, heating and ventilation needs of the entire office area, guaranteeing that the requirements in terms of comfort and indoor air quality are constantly met throughout the year.

Project’s main aspects

When designing a HVAC system for a building, many of us think of efficiency as the most important aspect, and that is definitely a very important aspect Daikin can help with, thanks the very high efficiency levels its products can offer. But another equally important aspect is being able to create a good, comfortable working environment, ensuring peoples well being.

Indoor Air Quality is a central topic when it comes to creating a good working environment.

Read more here about how how indoor air quality can help creating a better working environment

Daikin air Handling Units will provide the bank’s employees with modern and high-quality working environment, ensuring proper ventilation of the premises and filtration of the indoor air, so the occupants can breathe the purest possible air while at work.

Creating an environment with good indoor air quality, not only will allow to the bank to ensure employees wellbeing and reduce their sick leaves, but will also protect their employees during this pandemic, minimizing the possibility of infection form Coronavirus.

Read more here about how how mechanical ventilation can help minimizing the spread of Coronavirus

 

Another important aspect in this project, was the need to ensure very low noise levels from the HVAC system installed, and have water-cooled chillers that could fit the narrow technical room. Those needs were met, in the case of the 2 Daikin EWWQ-G chillers, thanks to a customization specifically done for this project. The 2 units were intaslled in a stacked configuration, which reduced the footprint and allowed to use in an efficient way the space available. To guarantee very low noise levels, then, the compressors on the two units were enclosed in a special cabinet, which will allow these units to the lowest possible noise levels.

And last but not least, there was the need to have remote monitoring and smart maintenance platform, which will allow to constantly monitor and even control from remote the HVAC system serving the building. For this reason Daikin on Site was included in the solution.

Read here about how Daikin can meet Facility management needs in office buildings

Are you interested in Daikin ventilation solutions? Then, get in touch with the form below.

Contact